summaryrefslogtreecommitdiff
path: root/gemfeed/2023-11-19-site-reliability-engineering-part-2.md
diff options
context:
space:
mode:
Diffstat (limited to 'gemfeed/2023-11-19-site-reliability-engineering-part-2.md')
-rw-r--r--gemfeed/2023-11-19-site-reliability-engineering-part-2.md4
1 files changed, 2 insertions, 2 deletions
diff --git a/gemfeed/2023-11-19-site-reliability-engineering-part-2.md b/gemfeed/2023-11-19-site-reliability-engineering-part-2.md
index 3fd48c9c..9bddfbcc 100644
--- a/gemfeed/2023-11-19-site-reliability-engineering-part-2.md
+++ b/gemfeed/2023-11-19-site-reliability-engineering-part-2.md
@@ -6,7 +6,7 @@ This is the second part of my Site Reliability Engineering (SRE) series. I am cu
[2023-08-18 Site Reliability Engineering - Part 1: SRE and Organizational Culture](./2023-08-18-site-reliability-engineering-part-1.md)
[2023-11-19 Site Reliability Engineering - Part 2: Operational Balance in SRE (You are currently reading this)](./2023-11-19-site-reliability-engineering-part-2.md)
-[2024-01-09 Site Reliability Engineering - Part 3: On-Call Culture and the Human Aspect](./2024-01-09-site-reliability-engineering-part-3.md)
+[2024-01-09 Site Reliability Engineering - Part 3: On-Call Culture and the Human Side](./2024-01-09-site-reliability-engineering-part-3.md)
```
⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⢀⣠⣾⣷⣄⡀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀
@@ -42,7 +42,7 @@ That all sounds pretty idealistic. The reality is that getting the perfect balan
Continue with the third part of this series:
-[2024-01-09 Site Reliability Engineering - Part 3: On-Call Culture and the Human Aspect](./2024-01-09-site-reliability-engineering-part-3.md)
+[2024-01-09 Site Reliability Engineering - Part 3: On-Call Culture and the Human Side](./2024-01-09-site-reliability-engineering-part-3.md)
E-Mail your comments to `paul@nospam.buetow.org` :-)