diff options
Diffstat (limited to 'gemfeed/2023-11-19-site-reliability-engineering-part-2.md')
| -rw-r--r-- | gemfeed/2023-11-19-site-reliability-engineering-part-2.md | 4 |
1 files changed, 2 insertions, 2 deletions
diff --git a/gemfeed/2023-11-19-site-reliability-engineering-part-2.md b/gemfeed/2023-11-19-site-reliability-engineering-part-2.md index 3fd48c9c..9bddfbcc 100644 --- a/gemfeed/2023-11-19-site-reliability-engineering-part-2.md +++ b/gemfeed/2023-11-19-site-reliability-engineering-part-2.md @@ -6,7 +6,7 @@ This is the second part of my Site Reliability Engineering (SRE) series. I am cu [2023-08-18 Site Reliability Engineering - Part 1: SRE and Organizational Culture](./2023-08-18-site-reliability-engineering-part-1.md) [2023-11-19 Site Reliability Engineering - Part 2: Operational Balance in SRE (You are currently reading this)](./2023-11-19-site-reliability-engineering-part-2.md) -[2024-01-09 Site Reliability Engineering - Part 3: On-Call Culture and the Human Aspect](./2024-01-09-site-reliability-engineering-part-3.md) +[2024-01-09 Site Reliability Engineering - Part 3: On-Call Culture and the Human Side](./2024-01-09-site-reliability-engineering-part-3.md) ``` ⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⢀⣠⣾⣷⣄⡀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀ @@ -42,7 +42,7 @@ That all sounds pretty idealistic. The reality is that getting the perfect balan Continue with the third part of this series: -[2024-01-09 Site Reliability Engineering - Part 3: On-Call Culture and the Human Aspect](./2024-01-09-site-reliability-engineering-part-3.md) +[2024-01-09 Site Reliability Engineering - Part 3: On-Call Culture and the Human Side](./2024-01-09-site-reliability-engineering-part-3.md) E-Mail your comments to `paul@nospam.buetow.org` :-) |
